Recent Posts

The Long History of a Brand New Building

The Long History of a Brand New Building

It took almost 20 years and required surviving two bond referendums, a recession, a few name changes and a pandemic. But, today, the new home of the NC State ISE Department stands tall.

Hodgson Shows Support for EB Oval Project

This is a repost of an article from NC State Engineering’s website – [original article] Sustaining Support Dr. Thom Hodgson, Distinguished University Professor and Alumni...
The Engineering Oval Fund

The Engineering Oval

With the Connect NC Bond passing by a wide margin in March, the Engineering Oval building takes another giant step toward becoming the future home...