( click here to skip navigation links )
 
^ Home : News : Directory : Overview : Undergraduate : Graduate : Research :
^ Home : News : Directory : Overview : Undergraduate : Graduate : Research :
 
   

Technical Report Titles

 
       
   

2002 Technical Reports

02-01 Not used.
02-02 Joines, Sharon, Carolyn M. Sommerich.  Low-Level Exertions of the Neck Musculature:  A Study of Research Methods, Fatigue Development, and Effects of Age.  September 2002.

2001 Technical Reports

01-01 Irizarry, Maria De Los A., Michael E. Kuhl, Emily K. Lada, Sriram Subramanian, James R. Wilson.  Analyzing Transformation-Based Simulation Metamodels.  March, 2001.
01-02 Lertworasirikul, Saowanee, Jeffery A. Joines, Shu-Cherng Fang, Henry L. W. Nuttle.  Fuzzy Data Envelopment Analysis (Fuzzy DEA):  Possibility Approach.  September, 2001.
01-03 Melton, Ryan H., C. Thomas Culbreth, Stephen D. Roberts, Jeffrey A. Joines.  Design and Evaluation of Furniture Finishing Systems.  October, 2001.

2000 Technical Reports

00-01 Bennett-Joines.
00-02 Irizarry, Maria de los A., James R. Wilson and Jaime Trevino.  A Flexible Simulation Tool for Manufacturing Cell Design, I: Model Structure, Operation, and Case Study.  January, 2000.
00-03 Irizarry, Maria de los A., James R. Wilson and Jaime Trevino.  A Flexible Simulation Tool for Manufacturing Cell Design, II: Response Surface Analysis and Case Study.  January, 2000.

1999 Technical Reports

99-01 Kay.
99-02 Chiu, Nan-Chieh, Shu-Cherng Fang and Yuan-Shin Lee.  Sequencing Parallel Machining Operations by Tabu Search.  March, 1999.
99-03 Wu, Soon-Yi, Shu-Cherng Fang and Chih-Jen Lin. Solving the General Capacity Problem. July, 1999.

99-04 Kuhl, Michael and James R. Wilson.  Least Squares Estimation of Nonhomogeneous Poisson Processes.  September, 1999.
99-05 Steiger, Natalie M and James R. Wilson.  Improved Batching for Simulation Output Analysis, I: Convergence Properties.  October, 1999.
99-06 Steiger, Natalie M and James R. Wilson.  Improved Batching for Simulation Output Analysis, II: Algorithm Development.  October, 1999.
99-07 Kuhl, Michael E. and James R. Wilson.  Modeling and Simulating Poisson Processes Having Trends or Nontrigonometric Cyclic Effects.  October, 1999.

1998 Technical Reports

98-01 Fang.
98-02 Arumugam, V. , S. DeWald, D. R. Cormier, and J. B. Taylor. Solid Model Slicing System for Rapid Prototyping Applications, July, 1998.
98-03 Huang, Jimmy Chung-Cheng, C. Thomas Culbreth, Jeffrey A. Joines, Russell King, and Thom J. Hodgson.  Decision Support System for Lumber Procurement and Dry Kiln Scheduling.  May, 1998.
98-04 Wang, Dingwei, Shu-Cherng Fang and Henry L.W. Nuttle.  Soft Computing for Multi-Customer Due-Date Bargaining.  May, 1998.
98-05 Chiu, Nan-Chieh, Shu-Cherng Fang and Yuan-Shin Lee.  Sequencing Parallel Machining Operations by Genetic Algorithms.  May, 1998.

1997 Technical Reports

97-01 Hodgson, Thom J., Denis Cormier, Alexander J. Weintraub, and Andrew Zozom, Jr.  A Procedure for Scheduling to Satisfy Due-Dates in Large Job-Shops. January, 1997.
97-02 Fathi/Nuttle.
97-03 Fathi.
97-04 King, R.E. and Pinnow, A.D.  Break-even Costs for Traditional versus Quick Response Apparel Suppliers. June 23, 1997.
97-05 Damerdji, Halim, Peter W. Glynn, Marvin K. Nakayama, and James R. Wilson.  Selection of the Best System in Steady-State Simulation.  February, 1997.
97-06 Humphrey, David and James R. Wilson.   A revised simplex search procedure for stochastic response surface optimization.  September 15, 1997.
97-07 Damerdji, Halim, Peter W. Glynn, Marvin K. Nakayama, and James R. Wilson.  Selecting the Best System in Transient Simulations.  February, 1997.
97-08 Fang.
97-09 Fang.
97-10 Davis, Afi L. and Shu-Cherng Fang.  Fuzzy-Control-Based Routing in an ATM Network.
97-11 Davis, Afi L. and Shu-Cherng Fang. Tuning Fuzzy Control Systems by Using Genetic Algorithms.

1996 Technical Reports

96-01 Houck, Christopher R., Jeffrey A. Joines, and Michael G. Kay.  Utilizing Lamarckian Evolution and the Baldwin Effect in Hybrid Genetic Algorithms.  February, 1996.
96-02 Houck, Christopher and Russell E. King.  Operator Selection for Genetic Scheduling Applications. April 17, 1996.
96-03 Houck, Christopher R. and Michael G. Kay.  Adapting the Order and Frequency of Genetic Operators through Co-Evolving Populations.  February, 1996.
96-04 Fathi, Yahya.  A Mathematical Model for the Parameter Design Problem with High-Low Tolerancing.  March 22, 1996.
96-05 Not used.
96-06 Houck, Christopher R., Jeffrey A. Joines, and Michael G. Kay.  Characterizing Search Spaces for Tabu Search.  February, 1996.
96-06 (Duplicate Number) Damerdji, Halim and Peter W. Glynn.  Limit Theory for Performance Modeling of Future Event Set Algorithms.  December, 1996.
96-07 Hunter, N. Alan and Russell E. King.  A Note on the Impact of Size Distribution Forecast Error on Retail Performance.  July 29, 1996.
96-08 Chen, Y.-H., Y.-S. Lee and S.-C. Fang.  Optimal Cutter Selection and Machining Plane Determination for Process Planning and NC Machining of Complex Surfaces.
96-09 Damerdji, Halim and Marvin K. Nakayama.  Two-Stage Multiple-Comparison Procedures for Steady-State Simulations.  December, 1996.

1995 Technical Reports

95-01 Houck, Christopher R., Jeffrey A. Joines, and Michael G. Kay.  Comparison of Genetic Algorithms, Random Restart, and Two-Opt Switching for Solving Large Location-Allocation Problems.  March, 1955.
95-02 Houck, Christopher R. and Russell E. King.  A Neural Fuzzy Decision System for Learning User Preference of Multi-Attribute Design Evaluation.  August 10, 1995.
95-03 Kay, Michael G. and James R. Wilson.  Evaluation of AGV Routing Strategies Using Hierarchical Simulation.  April 15, 1995.
95-04 Martin, Paula E., Yahya Fathi, and Ravi O. Mittal.  Comparing Alternative Manufacturing Sequences: Quality and Cost.
95-05 Avramidis, A. N., and James R. Wilson.  Correlation-Induction Techniques for Estimating Quantiles in Simulation Experiments.  January 22, 1995.
95-06 Damerdji, Halim and Peter W. Glynn.  Performance Analysis of Future Event Sets.  June, 1995.
95-07 Kuhl, Michael E. and James R. Wilson.  Estimation and Simulation of Nonhomogeneous Poisson Processes Having Multiple Periodicities.  September 8, 1995.
95-08 Hurley, Barbara J. and James R. Wilson.  A Simulation-Based Methodology for Minimum-Cost Design of Manufacturing Cells.  September, 1995.
95-09 Houck, Christopher R., Jeffrey A. Joines, and Michael G. Kay.  A Genetic Algorithm for Function Optimization:  A Matlab Implementation.  October 12, 1995.
95-10 Li, Xing-Si and Shu-Cherng Fang.  On the Entropic Regularization Method for Min-Max Problems with Applications.  December, 1995.

1994 Technical Reports

94-01 Wu, Peitsang, Shu-Cherng Fang, Henry L.W. Nuttle, Russell E. King, and James R. Wilson.  Decision Surface Modeling of Textile Spinning Operations Using Neural Network Technology.  February 8, 1994.
94-02 Sezgi, Umit S., Adrianna G. Kirkman, Hasan Jameel, Hou-min Chang, James R. Wilson, John J. Morrison, and Craig A. Bianchini.  A Combined Discrete-continuous Simulation Model of an RDH Tank Farm.  March, 1994.
94-03 Cline, James, Yahya Fathi, Ravi O. Mittal, and Robert Robison.  Statistical Tolerancing of Machined Parts.
94-04 Cline, James E., Yahya Fathi, Ravi O. Mittal.  Comparing Alternative Manufacturing Sequences from the Point of View of Tolerance Buildup.  Part I.  April 4, 1994.
94-05 Cline, James E., Yahya Fathi, Ravi O. Mittal.  Comparing Alternative Manufacturing Sequences from the Point of View of Tolerance Buildup.  Part II.  April 4, 1994.
94-06 Lutz, James D., Daniel W. Halpin, and James R. Wilson.  Simulation of Learning Development in Repetitive Construction.  April 25, 1994.
94-07 Kim, Yeongho and Peter O'Grady.  A Methodology for Analyzing Large-Scale Concurrent Engineering Systems.  January 14, 1994.
94-08 O'Grady, Peter and Denis Cormier.  Using Genetic Algorithms and Constraint Modeling in Concurrent Engineering. 
94-09 O'Grady, Peter, Stephen Fohn, Arthur Greef, and Robert Young.  A Constraint Based Approach to AS/AR Design. 
94-10 Kim, Chongsu and Peter O'Grady.  A Representation Formalism for Feature-Based Design.  June 23, 1994.
94-11 Greef, Arthur R., Steffen M. Fohn, Robert E. Young, and Peter J. O'Grady.  Implementation of a Logic-Based Support System for Concurrent Engineering.  April, 1994.
94-12 Damerdji, Halim.  On the Batch Means and Area Variance Estimators.  May, 1994.
94-13 Damerdji, Halim and Peter Glynn.  Some New Results on the Interaction Hold Model of Simulation Future Event Sets.  May, 1994.
94-14 O'Grady, Peter J. and Chongsu Kim.  A Feature-Based Design System for Printed Wiring Boards.  June 23, 1994.
94-15 Trevino, Jaime and Pedro Resto.
94-16 Cline, James E., Yahya Fathi, Ravi O. Mittal.  Comparing Alternative Manufacturing Sequences from the Point of View of Tolerance Buildup.  Part III.  June 28, 1994.
94-17 Stanfield, Paul M. and Russell E. King.  Multiobjective Stochastic Scheduling Using Genetic Algorithms.  August 17, 1994.
94-18 Wagner, Mary Ann Flanigan and James R. Wilson.  Graphical Interactive Simulation Input Modeling with Bivariate Bézier Distributions.  September 19, 1994.
94-19 Hopper, Douglas A., P. Allen Hammer, and James R. Wilson.  Comparison of Two-Simulation-Based Methods for Modeling Plant Growth over Time.  September 20, 1994.
94-20 Joines, Jeffrey A., Russell E. King, and C. Thomas Culbreth.  A Comprehensive Review of Production-Oriented Manufacturing Cell Formation Techniques.  November, 1994.
94-21 King, Russell E., and N. A. Hunter.  Demand Re-Estimation and Inventory Replenishment of Basic Apparel in a Specialty Retail Chain.  December 2, 1994.
94-22 Hodgson, Thom J., Michael G. Kay, Ravi O. Mittal, and Shih-Yi Tang.  Evaluation of Straightness and Flatness Algorithms for Coordinate Measuring Machines.  December, 1994.

1993 Technical Reports

93-01 Ayoub, Mahmoud A., Sharon M. B. Joines and D. C. DelVecchio.  An Ergonomics Analysis of the Personal Computer: The Risk of Cumulative Trauma Disorders in Manual Assemblers and in PC Users.  March, 1993.
93-02 King, Russell E. and Kyung Sup Kim.  AGV Talk: Object-Oriented Stimulation for AGV Systems.  February, 1993.
93-03 Wilson, James R. and Athanassios N. Avramidis.  Regression-Based Methods for Estimating Inverse Distribution Functions in Simulation Experiments.  February, 1993.
93-04 Culbreth, C. Thomas, Michael O. Miller, and Peter O'Grady.  CESFAM: A Concurrent Engineering System to Support Flexible Automation in Furniture Manufacturing.  April, 1993.
93-05 Sanii, Ezat and Youngrai Lee.  Process Selection and Operation Sequencing Based on Feature Extraction.  May, 1993.
93-06 Stanfield, Paul M. and Russell E. King.  A Survey of Stochastic Scheduling.  July, 1993.
93-07 Damerdji, Halim.  Mean Square Consistency of the Variance Estimator in Steady-State Simulation Output Analysis.  Rev. July, 1993.
93-08 Damerdji, Halim.  Parametric Inference for Generalized Semi-Markov Processes.  December, 1993.
93-09 Culbreth, C. Thomas, Russell E. King and Christopher Houck.  Real-Time Scheduling of an FMC Using Neural Nets and the Methods of Temporal Difference (TD).  August, 1993.
93-10 Wilson, James R. and Mary Ann Flanigan.  Using Univariate Bezier Distributions to Model Simulation Input Processes.  October, 1993.
93-11 Wilson, James R. and Paul M. Stanfield.  Multivariate Input Modeling with Johnson Distributions.  October, 1993.
93-12 Lavelle, Jerome P., James R. Wilson, Harvey J. Gold and John R. Canada.  A Method for the Incorporation of Parametric Uncertainty in the Weighted Evaluation Multi-Attribute Decision Analysis Model.  October, 1993.
93-13 King, Russell E.
93-14 Damerdji, Halim and David Goldman.  Consistency of Several Variates of the Standardized Time Series Area Variance Estimator.  October, 1993.
93-15 Hopper, Douglas A., P. Allen Hammer and James R. Wilson.  A Simulation Model of Rosa hybrida Growth Response to Constant Irradiance and Day/Night Temperatures.  December, 1993.
93-16 Culbreth, C. Thomas, Jeffrey A. Joines and Russell E. King.  Mnufacturing Cell Design: An Integer Programming Model Employing Genetic Algorithms.  November, 1993.
93-17 Stanfield, Paul M. and Jeffrey A. Joines.  Formulation and Solution of a Fuzzy Scheduling Problem.  February, 1994.
93-18 Not used.
93-19 Wilson, James R. and Mary Ann Flanigan.  Using Univariate Bezier Distributions to Model Simulation Input Processes.  October, 1993.

1992 Technical Reports

92-01 Fathi, Yahya E. and Gary Vestuti.  Case Studies in Robust Design.  May, 1992.
92-02 Culbreth, C. Thomas and Russell E. King.  Design and Development of a Flexible Manufacturing Cell Control Architecture.  April, 1992.
92-03 Lee, Youngrai, Ezat Sanii and Ravi O. Mittal.  A Sliced Profile-Based Approach to Machined Feature Extraction from CSG Representation.  August, 1992.
92-04 Mittal, Ravi O. and Steven Jackson.  Automatic Generation of 2-Axis Laser-Cutter NC Machine Program and Path Planning from CAD.  August, 1992.
92-05 Hodgson, Thom J., Russell E. King and Paul M. Stanfield.  Production Planning and Scheduling with Stochastic Service Times.  October, 1992; rev. February, 1994.
92-06 Lee, Youngrai, Ezat Sanii and Ravi O. Mittal.  Slicing Characteristics in Sliced Profile-Based Automatic Extraction of Machined Features from CSG Representation.  September, 1992.
92-07 Hunter, Alan N. and Russell E. King.  Simulation Modeling of Basic Goods Distribution in a Specialty Chain.  September, 1992.
92-08 Lee, Youngrai, Ezat Sanii and Ravi O. Mittal.  Construction and Analysis of Sliced Profiles for Automatic Extraction of Machined Features from CSG Representation.  October, 1992.
92-09 Wilson, James R. and Athanassios N. Avramidis.  A Flexible Method for Estimating Inverse Distribution Functions in Simulation Experiments.  November, 1992; rev.  April, 1994.
92-10 Wilson, James R., Mary A. Johnson and Sanghoon Lee. Experimental Evaluation of a Procedure Estimating Nonhomogeneous Poisson Processes Having Cyclic Behavior.  November, 1992; rev April, 1994.
92-11 Wilson, James R., Mary A. Johnson and Sanghoon Lee. NHPP-MLE and NHPP-SIM: Software for Estimating and Simulating Nonhomogeneous Poisson Processes Having Cyclic Behavior.  October, 1992; rev. March, 1994.
92-12 Wilson, James R. and Athanassios N. Avramidis.  Integrated Variance Reduction Strategies for Simulation.  October, 1992; rev. February, 1994.
92-13 Fathi, Yahya E. and Scott Kegler.  Saw Arbor Generation and Scheduling for Computer-Assisted Gang Rip Saw Systems.  December, 1992.
92-14 Not used.
92-15 Damerdji, Halim.  Strong Consistency of the Variance Estimator in Steady-State Simulation Output Analysis.  July, 1992; rev. July, 1991, April, 1992, December, 1992.
92-16 Damerdji, Halim.  Maximum Likelihood Estimation for Generalized Semi-Markov Processes.  August, 1992; rev. December, 1993.

1991 Technical Reports

91-01 Kim, Joo-Yong, Peter J. O'Grady and Robert E. Young.  Feature Taxonomies for Rotational Parts: A Review and Proposed Taxonomies.  June, 1991. 
91-02 Oh, Jhong Sik, Peter j. O'Grady and Robert E. Young.  An Artificial Intelligence Constraint  Network Approach to Design for Assembly.  January, 1991.
91-03 Young, Robert E., Arthur Greef and Peter J. O'Grady.  An Artificial Intelligence-Based Constraint Network System for Concurrent Engineering.  November, 1990; rev. January, 1991.
91-04 Liau, Jong-Shin and Robert E. Young.  A Review of Approaches for Integrating Relational Databases and Knowledge-Bases.  February, 1991.
91-05 Young, Robert E. and Johan Vesterager.  An Approach to CIM System Development Whereby Manufacturing People Can Design and Build Their Own CIM Systems.  December, 1990.
91-06 Hunter, N. Alan, Russell E. King and Henry L. W. Nuttle.  Evaluation of Traditional and Quick Response Retailing Procedures Using a Stochastic Simulation Model.  April, 1991.
91-06a Hunter, N. Alan, Russell E. King and Henry L. W. Nuttle.  Comparison of Quick Response and Traditional Retailing Performance through Stochastic Simulation Modeling.  June, 1991.
91-07 Hunter, N. Alan, Russell E. King and Henry L. W. Nuttle.    An Apparel Supply System for QR Retailing.  June, 1991.
91-08 Fathi, Yahya E. and Krishna Ginjupalli.  A Linear Approximation Model for the Variance Minimization Problem.  June, 1991.
91-09 O'Grady, Peter J. and R. Seshadri.  X-Cell - Inteligent Cell Control Using Object Oriented Programming (Part I). 1991.
91-10 O'Grady, Peter J., Robert E. Yong, Arthur Greef and L. Smith.  An Advise System for Concurrent Engineering. 1991.
91-11 Avrimidis, Athanassios N. and James R. Wilson.  A Splitting Scheme for Control Variates.  August, 1991.
91-12 Johnson, Mary A., Sanghoon Lee and James R. Wilson.  Experimental Evaluation of a Procedure for Estimating Nonhomogeneouis Poisson Procedures Having Cyclic Behavior.  August, 1991.
91-13 Veermani, Dharmarah, Moshe M. Barash and James R. Wilson.  A Method for Generating Random Cutting-Tool Requirement Matrices for Manufacturing Systems Simulation.  August, 1991.
91-14 Bauer, Kenneth W., Jr. and James R. Wilson.  Control-Variance Selection Criteria.  September, 1991.
91-15 Gu.  (Not on file)
91-16 Koksal, Gulser and William A. Smith, Jr.  Quality Function Deployment: A Multi- Stage Application Perspective and A Case Study.  November, 1991.
91-17 Tew, Jeffery S. and James R. Wilson.  Estimating Simulation Metamodels Using Combined Correlation-Based Variance Reduction Techniques.  October, 1991.
91-18 Porta Nove, Acacio M. de O. and James R. Wilson.  Selecting Control Variates to Estimate Multi-Response Simulation Metemodels.  November, 1991.
91-19 Deabler, Greg.  (Not on file)
91-20 Chappell, Alan R. and Yahya E. Fathi.  Robust Design: A Quality Enhancement Tool for the Aerospace Industry.  December, 1991.

1990 Technical Reports

90-01 Fathi, Yahya E. and K. K. Ginjupalli.  The Turbine Balancing Problem.  January, 1990.
90-02 Deleersnyder, J., Thom J. Hodgson, Russell E. King, Peter J. O'Grady and A. Savva.  Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model.  Rev. July, 1990.
90-03 Koksal, Gulser and William A. Smith, Jr.  System Analysis for Dyehouse Quality Control.  April, 1990.
90-04 Bhadury, Bikash and Yayya E. Fathi.  Cost and Quality Considerations in Optimal Design: A Case Study.  May, 1990.
90-05 Bernhard, Richard H.  Income, Wealth Base and Rate of Return Implications of Alternative Project Evaluation Criteria.  June, 1990; rev. May, 1991.
90-06 Koksal, Gulser and William A. Smith, Jr.  Quality Function Deployment:: An Application Perspective for Textiles Dyeing and Finishing.  July, 1990.
90-07 Bernhard, Richard H.  Adjusted Present Values, Costs of Capital and Their Underlying Debt Financing Implications.  September, 1990.
90-08 Hewitt, Williard C., Jr., Thom J. Hodgson, N. Alan Hunter and Russell E. King.  Analysis of the Benefits of Quick Response Implementation for the Domestic Retail, Apparel and Textile Industries.  September, 1990; rev. July, 1991.
90-09 King, Russell E. and Martha L. Poindexter.  A Simulation Model for Retail Apparel Buying.  September, 1990; rev. September, 1991.
90-10 Hodgson, Thom J., Russell E. King and Carlton M. Wilson.  Analysis and Control of Multiple Vehicle AGV Systems. September, 1990; rev. September, 1991.
90-11 Nuttle, Henry. L. W., Russell E. King and N. Alan Hunter.  A Stochastic Model of the Apparel Retailing Process for Seasonal Apparel.  September, 1990; rev. March, 1991.
90-12 Wang, Dingwei.  Experiments on the Unconstrained Convex Programming Approach to Linear Programming.  September, 1990.
90-13 King, Russell, E., N. Alan Hunter, M. Poindexter and M. Coleman.  Apparel Retail Model (ARM) Version 2.0 Operating Manual.  November, 1990; rev. January, 1991.
90-14 Hodgson, Thom J., Russell E. King and Carlton M. Wilson.  Incorporation of Improved Information in the Control of Multiple Vehicle AGV Systems.  November, 1990; rev. May, 1991.
90-15 Sanii, Ezat T. and Jong-Shin Liau.  An Expert Process Planning System for Electronics Assembly.  December, 1990.
90-16 Bischak, Diane P.  An Application of Decision Theory to Parallel Simulation.  December, 1990.

1989 Technical Reports

89-01 King, Russell E. and Eloise McLean.  Development of an Information Modeling Analysis Tool: A Case Study.  September, 1989.
89-02 Davis, Ronald E. and Ezat T. Sanii.  DCAPP: A Distributed Computer Aided Process Planning in a Dynamic Manufacturing Environment.  January, 1989.
89-03 Sanii, Ezat T., Ren C. Lou, David F. McAllister, William J. Rasdorf and Han Bao.  Integrated CAD/CAM System for Orthopedic Footwear.  December, 1989.
89-04 Culbreth, C. Thomas, Russell E. King and Ezat T. Sanii.  A Flexible Manufacturing System for Furniture Production.  March, 1989.
89-05 Chafee, Franklin W., Russell E. King and Thom J. Hodgson.  Scheduling of Material Handling Equipment in a Flexible Manufacturing Cell.  March, 1989.
89-06 King, Russell E., C. Thomas Culbreth and Brian K. Spiro.  (Not on file)
89-07 King, Russell E. and Waring L. Worsham.  Simulation and Animation of the Cherry Point, NC Naval Aviation Depot Blade/Vane Rework Facility.  March, 1989.
89-08 Bernhard, Richard H.  Improving the Economic Logic Underlying Replacement Age Decisions for Municipal Garbage Trucks.  April, 1989; rev. July, 1989.
89-09 Clemete, Gonzalo.  Lot Sizing Procedure for JIT Purchasing Strategies.  March, 1989.
89-10 Fathi, Yahya E. and S. Turner.  A Computational Experiment with SQVAM.  April, 1989.
89-11 Bischak, Diane P.  Weighted Batch Means for Improved Confidence Intervals for Steady-State Processes.  March, 1989.
89-12 King, Russell E. and Carlton M. Wilson.  A Review of AGV System Design and Scheduling.  July, 1989.
89-13 Kim, Joo-Yong.  Automatic Part Programming (AUTOPP) in a Feature Based Environment.  (Not on file)
89-14 Hodgson, Thom J., Christine U. King and Russell E. King.  Development of a Production Planning System: A Case History.  August, 1989.
89-15 Fathi, Yahya E.  Tolerance Considerations in Optimal Design.  August, 1989.
89-16 Kalbavi, Ganesh R., C. Thomas Culbreth and Ezat T. Sanii.  Automatic Grasp Planning: Review, Issues and the Development of a Grasp Assistant for Grasping Tasking.  August, 1989.
89-17 Sanii. (Not on file)
89-18 Sanii. (Not on file)
89-19 Sanii. (Not on file)
89-20 King, Russell E. and Scott Scherbenske.  Current Developments in Costs Accounting/Performance Measurement Systems for Implementing Advanced Manufacturing Technology.  November, 1989; rev. January, 1990.
89-21 Sanii, Ezat T., C. Thomas Culbreth and Russell E. King. Integrated Interchangeable End of Arm Tooling for Furniture Part Manipulation.  December, 1989.

1988 Technical Reports

88-01 King, Russell E. and Nathan C. Claridy.  An Analysis of Demand Horizon in Routing Rules for an Automated Guided Vehicle System.  April, 1988.
88-02 Reymann, Theodore M. and Russell E. King.  A Performance Measurement and Implementation Methodology in a Department of Defense CIM Environment.  August, 1988.
88-03 Fathi, Yahya E.  A Note on the Taguchi's Concept of the Producer's Tolerance.  May, 1988.
88-04 Ramers, Douglas L. and Ezat T. Sanii.  Discussion of Process Planning and Survey of Generative Computer Automated Planning Systems.  July, 1988.
88-05 Henkler, Edward S.  A Sail Training Program Diagnosis and Change Strategy.  1988.
88-06 Burton, William C.  Development of a Nursing Information System.  May, 1988.
88-07 Hollodick, Kelly and Russell E. King.  Sojourn Distributions for Particular Customers in Serial Networked of Queues.  August, 1988.
88-08 Fathi, Yahya E.  Robust Design of Manufacturing Products: An Analytical Approach.  September, 1988.
88-09 Fathi, Yahya E.  Optimal Design of a Wheaton Bridge Using SQVAM.  September, 1988.
88-10 Davis, Ronald E. and Ezat T. Sanii.  Implementing A Distributed Computer Aided Process Planning System.  August, 1988.
88-11 Kalbavi, Ganesh R. and Ezat T. Sanii.  Discussion of Architecture for Integrated Robot Control. August, 1988.
88-12 Srinivasan, Krishnan and Ezat T. Sanii.  AI Based Process Planning for Electronic Assembly.  September, 1988.
88-13 Sanii, Ezat T., Russell E. King and Linda V. Birch.  General Purpose Emulation of Manufacturing Systems.  September, 1988.
88-14 Liao, Hsuan-Hui.  Design Procedure for Storage Carousel Using Simulation.  September, 1988.
88-15 Kalbavi, Ganesh R. and Ezat T. Sanii.  Issues in Integrated Robotics and a Proposed System for Intelligent Robot Task Planning.  November, 1988.
88-16 Brandon, Richard L. (under the direction of J. R. Canada).  Expansive Layout and Optimization of Inventory Levels in the Central Distribution Department of North Carolina Memorial Hospital.  September, 1988.
88-17 Bernhard, Richard H.  Base Selection for "Modified" Rates of Return, and Its Irrelevance for Optimal Project Choice.  November, 1988.
88-18 Bernhard, Richard H.  and John R. Canada.  Some Problems in Using Benefit/Cost Ratios with the Analytic Hierarchy Process.  November, 1988.

1987 Technical Reports

87-01 Yavuz, Kamil and Edward L. Fisher.  Astec User Reference Manual.  (Not on file)
87-02 Yavuz, Kamil and Edward L. Fisher.  A Knowledge-Based Methodology for Equipment Selection. (Not on file)
87-03 Yavuz, Kamil and Edward L. Fisher.  Astec: A Knowledge System for Assembly Equipment Selection.  (Not on file)
87-04 Fisher, Edward L. and David Hesselberth.  NC-Shell User Reference Manual.  (Not on file)
87-05 Yamani, Abdulrahman, Thom J. Hodgson and Louis A. Martin-Vega.  Optimization of a Constrained Spherical Location Problem: The Case of Single Air Craft Mid-air Refueling.  March, 1987; rev. October, 1988, August, 1989.
87-06 Monteith, Steve K., Russell E. King and Thom J. Hodgson.  Evaluation of Heuristic Control Strategies for AGV's Under Varying Demand Arrival Patterns.  March, 1987.
87-07 Shamlin, David B. and Edward L. Fisher.  Methodology for Coupling Knowledge Systems with Multiple Databases.  (Not on file)
87-08 Deleersnyder, Jean-Luc, Thom J. Hodgson, Henry Muller-Malek and Peter J. O'Grady.  Kanban Controlled Pull Systems-Insights from a Markovian Model.  December, 1987; rev. October, 1988, May, 1989.
87-09 Fathi, Yahya E. and Henry L. W. Nuttle.  The Single Machine Common Deadline Weighted Tardiness Problem.  August, 1987.

1986 Technical Reports

86-01 O'Grady, Peter J., Han Bao and K. H. Lee.  The Structure of an Intelligent Cell Controller for Automated Manufacturing Systems.  April, 1986.
86-02 Julian, Phil and Bryan Monahan.  An Evaluation of Speech I/O in the Factory: Dynamic Forklift Routing.  1986.
86-03 Not used.
86-04 Not used.
86-05 Not used.
86-06 Not used.
86-07 Larson, N., T. Moody and Michael G. Joost.  The Effects of Background Noise on ASR Performance Using Inertial and Headset Microphones. 1986.
86-08 Vail, Rachel E., F. Chafee, G. Hills, A. Plisko and D. Redman.  Suitability of Voice-Activated Control of Peripheral Driving Tasks for the Severely Physically Handicapped.  June, 1986.
86-09 Not used.
86-10 Not used.
86-11 Fathi, Yahya E. and Katta G. Murty.  Computational Behavior of a Feasible Direction Method for Linear Programming.  July, 1986.
86-12 Bernhard, Richard H.  On the Choice of the Sharing Fraction for Incentive Contracting.  October, 1986.
86-13 King, Russell E., Thom J. Hodgson and Steve K. Monteith.  Extracting Heuristic Control Rules for AGVs Using Markov Decision Processes.  October, 1986.
86-14 King, Russell E. and Thom J. Hodgson.  Sojourn Distribution for Particular Customers in Serial Networks of Queues.  June, 1987.
86-15 King, Christina U. and Edward L. Fisher.  Object-Oriented Shop-Floor Design, Simulation and Evaluation.  November, 1986.
86-16 Ding, Fong-Yuen and Thom J. Hodgson.  An Optimal and Approximate Policies for a Multi-Stage Production/Inventory Problem.  December, 1986.
86-17 Fathi, Yahya E. and Javad Taheri.  A Mathematical Model for Loading Sequencers.  December, 1986.

1985 Technical Reports

85-01 Hodgson, Thom J. and Henry L. W. Nuttle.  A Linear Model for the Single Machine Lotsize Scheduling Problem.  March, 1985.
85-01a Hodgson, Thom J. and Henry L. W. Nuttle.  A Note on Linear Programming and the Single Machine Lotsize Scheduling Problems.  June, 1985.
85-02 Hodgson, Thom J., Russell E. King, McClave, Sullivan and Zegel.  Analysis and Modeling of a Proposed Mining and Benefication Process.  March, 1985.
85-03 Ding, Fung Yung, Thom J. Hodgson and Russell E. King.  A Methodology for Computation Reduction for Specially Structured Large Scale Markov Decision Problems.  January, 1985; rev. November, 1986.
85-04 Not used.
85-05 Lindsey, Beth.  Experimentation Via Simulation on the Automated Guided Vehicle System Component of the Naval Air Rework Facility Factory Automation.  April, 1985.
85-06 Not used.
85-07 Shin, Myong Ho, Richard H. Bernhard and Duncan M. Holthausen, Jr.  Application of the Capital Asset Pricing Model to Multi-Period Investments: Comments and a Modified Procedure.  May, 1985.
85-08 Frazelle, Edward H.  Productivity Measurement and Improvement in Laboratory Animal Science Operations.  June, 1985.
85-09 Fathi, Yahya E. and Henry L. W. Nuttle.  Maximum vs. Expected Profit and the Faithful Newsboy Problem.  June, 1985; rev. November, 1985.
85-10 Kirks, David J. and Edward L. Fisher.  Fades Reference Manual.  June, 1985.
85-11 Not used.
85-12 Almond, Robert L. III.  Knowledge Worker Productivity Measurement: Establishing a Foundation for the Development of Management Outputs for Middle Level Managers of Budget-Based Organzations.  1985.
85-13 Hodgson, Thom J., Russell E. King, James T. McClave, James H. Sullivan and William C. Zegel.  Analysis and Modeling of a Proposed MinIng and Beneficiation Process.  July, 1985.
85-13a Thompson, Alex.  Improving the Efficiency of Simulation Output Analysis Through Variance Reduction.  September, 1985.
85-14 Not used.
85-15 Not used.
85-16 Farber, Jeremy B. and Edward L. Fisher.  MATHES: Material Handling Equipment Selection Expert System.  October, 1985.
85-17 Hodgson, Thom J., Russell E. King, Steve K. Monteith and Scott R. Schultz.  Developing Control Rules for an AGVs Using Markov Decision Processes.  December, 1985.

1984 Technical Reports

84-01 Frazier, James M.  Manufacturability Rating of PWAs: Implementation Computer Program.  March, 1984.  (Not on file.)
84-02 Gartland, J. P.  Computer Simulation as a Tool in Making Design and Purchasing Decisions for an Automated Guided Vehicle System.  July, 1984.
84-03 Nuttle, Henry L. W. and Graham.  A Comparison of Heuristics for a School Bus Scheduling Problem.  July, 1984.
84-04 Stidham, Shaler, Jr.  Optimal Control of Admission, Routing and Service in Queues and Networks of Queues: A Tutorial Review.  September, 1984.

1983 Technical Reports

83-01 Siddique, Laulak.  An Interactive Computer Code for Material Requirement Planning.  January, 1983.
83-02 Not used.
83-03 Bao, Han, Michael G. Joost and Robert E. Fulenwider.  Reliability of Display Products During Warranty Period.  March, 1983.
83-04 Shih, Haw.  Computerized Facilities Design.  August, 1983.
83-05 Not used.
83-06 Durham, John P.  Electric Power Systems Availability and Cost Benefits Due to an Improvement in the Electric Generating Units Availability and Efficiency.  April, 1983.
83-07 Not used.
83-08 Not used.
83-09 Not used.
83-10 Riverbark, Charles R.  Evaluation of Organizational Effectiveness Models in the Public Sector.  August, 1983.
83-11 Not used.
83-12 Eichman, Karen S.  A Study of Capcity Adjustment Policies in a Textile Company Division.  September, 1983.
83-13 Babb, Edward L., Jr.  The Feasibility of the Microcomputer and Dbase II as the Basis for a Parts Classification and Coding System.  December, 1983.

1982 Technical Reports

82-01 Not used.
82-02 Not used.
82-03 Not used.
82-04 Gaafar, Hussein.  Planning Crude Oil Processing Plants with Capacity Expansions.  April, 1982.
82-05 Hsieh, John-Ru.  A Review and Paralleling in Assembly Line Balancing.  July, 1982.
82-06 Not used.
82-07 Ajmera, Mansh D.  Time Phasing and Optimal Sizing for Manufacturing Capacity Expansion.  August, 1982.
82-08 Not used.
82-09 Ma, Roderick Bao-Kuo.  The Implementation of the CAM-I Automated Time Standard System for the Computer-Aided Planning of Manufacturing Processes.  October, 1982.

1981 Technical Reports

81-01 Not used.
81-02 Bukey, Ali.  Group Technology Machining Cell Based on Different Control Modes for Machine Tools.  April, 1981.
81-03 Liou, Kuan Lian.  The Generation of Simultaneous Orthogonal Views Supplemental to the COMPAC System.  April, 1981.
81-04 Stidham, Shaler, Jr., and Tayfur Altiok.  Buffer Size Allocation in Production Lives.  April, 1981.
81-05 Altiok, Tayfur.  Approximate Analysis of Exponential Tandem Queues with Blocking.  February, 1981.
81-06 Eichelberger, Karen.  A Production Capacity Measurement Procedure for a Multi-Product Manufacturing System.  May, 1981.
81-07 Not used.
81-08 Chang, Tzu-Lin.  Assembly and Documentation of the Computer Codes for Network Flow Progamming.  July, 1981.
81-09 Altiok, Tayfur and Shaler Stidham, Jr.   A Note on Transfer Lines with Unreliable Machines, Random Processing Times, and Finite Buffers.  July, 1981.
81-10 Not used.
81-11 Not used.
81-12 Not used.
81-13 Not used.
81-14 Smith, Jerry D.  Strategic Master Plan for a Fastening Systems Manufacturing Facility Warehouse Operations.  December, 1981.
81-15 Aguiluz, Antonio J. I.  Analysis of Materials Handling and Plant Layout Improvements for a Mexican Automobile Manufacturer.  December, 1981.
81-16 Not used.
81-17 Not used.
81-18 Kamath, Rajeev.  Selection and Management Techniques as Applied to a Chemical Plant Project.  1981.

1980 Technical Reports

80-01 Not used.
80-02 Not used.
80-03 Not used.
80-04 Not used.
80-05 Not used.
80-06 Athavale, Madhav.  A Critical Evaluation of the Blatt Proposals for Capital Investment Analysis.  July, 1980.
80-07 Not used.
80-08 Not used.
80-09 Zee, Tony K.  Applications of Q-Cert Modeling Technique in Planning and Scheduling.  August, 1980.

1979 Technical Reports

79-01 Stidham, Shaler, Jr.  On the Relation between Time Averages and Customer Averages in Stationary Marked Point Processes.  1979.
79-02 Not used.
79-03 Not used.
79-04 Jones, G. Robert.  A Guide for Novice Users of CAPP 2.1.  May, 1979.
79-05 Not used.
79-06 Arreaza, Vicente.  Decision Analysis for Moving a South American Production Company.  August, 1979.

1978 Technical Reports

78-01 Not used.
78-02 Wongwan, Anusorn.  The Generic Characteristics of Group Technology in Discrete Parts Production Developed from Published Case Studies.  April, 1978.
78-03 Morrison, David C.  Efficiency vs. Effectiveness a GT/MRP Trade-Off Evaluation, May, 1978.
78-04 Nuttle, Henry L. W.  Sequencing Jobs with a Single Resource.  May, 1978.
78-05 Not used.
78-06 Stidham, Shaler, Jr.  Queuing Systems Where L ≠ λW.  August, 1978.
78-07 Ho, Hai-Sen.  A Queuing-Hypercube Queuing Approach to Evaluate Emergency Deployment Policies.  October, 1978.
78-08 Nunen, Jo van and Shaler Stidham, Jr.  Action-Dependent Stopping Times and Markov Decision Processes with Unbounded Rewards.  1978.
78-09 Stidham, Shaler., Jr.  On the Convergence of Successive Approximations in Dynamic Programming with Non-Zero Terminal Reward.  October, 1978.

1977 Technical Reports

77-01 Not used.
77-02 Not used.
77-03 Seaman, Thomas H.  Simulation of an Operating Room System.  May, 1977.
77-04 Shore, Richard H. and James A. Tompkins.  Flexible Facilities Design.  October, 1977.
77-05 Not used.
77-06 Scudieri, A.  A Systems Analysis.Automotive Exhaust Pipe.  May, 1977 (Not on file.)
77-07 Bernhard, Richard H.  Evaluation on Multiperiod Projects: Net Present Value vs. Stockholder Wealth Maximization.  July, 1977.
77-08 Mahany, Hugh M.  The Implementation of a Group Technology System.  August, 1977.
77-09 Suga, Shigeo.  Utility Theory in the Multriattribute Decision-Making Problem.  August, 1977.
77-10 Not used.
77-11 Oldham, Conniesue B.  Organizational Behavior in a Multi-Project Environment.  December, 1977.

1976 Technical Reports

76-01 Not used.
76-02 Not used.
76-03 Elmore, Thomas S.  Investigation of Aggressive and Passive Overt Decisions in an Occupational Alcoholism Program.  April, 1976.
76-04 Not used.
76-05 Not used.
76-06 Bernhard, Richard H.  Theory Versus Practice in Risk Analysis: Comment.  July, 1976.
76-07 Bernhard, Richard H.  A Critique of the El-Ramly, Peterson and Seo Procedure for Assigning the Risk-Aversion Parameter in Baumol's Expected Gain-Confidence Limit Criterion.  August, 1976.
76-08 Knudsen, Niels C.  Individual and Social Optimization in Birth-Death Congestion System with a General Cost-Benefit Structure.  August, 1976.

1975 Technical Reports

75-01 Harder, John J.  Contributions by Science and Education to Computer-Aided Manufacturing.  1975.
75-02 Not used.
75-03 Not used.
75-04 Not used.
75-05 Bernhard, Richard H.  Utility Analysis Over Time, Interest Concepts and Their State-Preference Synthesis, with Some Critical Implications for the Theory of Discounting Under Risk.  July, 1975.
75-06 Bernhard, Richard H.  Unrecovered Investment, Uniqueness of the Internal Rate and the Question of Project Acceptability.  August, 1975.
75-07 Not used.
75-08 Smillie, Robert J. and Mahmoud A. Ayoub.  Accident Causation Theories: A Simulation Approach.  1975.

1974 Technical Reports

None Published.

1973 Technical Reports

73-01 Bennington, G. E. and L. F. McGinnis.  A Schedule Modifying Algorithm for Project Planning with Resource Constraints.  April, 1973.

 


 


 
   
^ to Top ^ Home : News : Directory : Overview : Undergraduate : Graduate : Research :
Maintained by ise-webmaster
North Carolina State University - Raleigh, NC
[ ENGR Template ]