2. "Book Review -- Numerical Linear Algebra and Optimization Vol. 1 ",
Networks, Vol. 24 (1994), 128-129.
3. "On Fuzzy Sets, Habitual Domains, Variational Inequalities, and Optimization",
R.J. Reynolds Lecture Notes, Engineering Publications, NC State University,
(2001).
4. "Preface",
Fuzzy Optimization and Deicision Making, Vol. 1(2002), i-iii.
Patent and Software:
1. "Optimal Control For Stochastic Linear Programming Systems ",
7 Claims, With S. Puthenpura, R. Saigal and L. Sinha, through AT&T Bell Laboratories,
submitted in February 1990.
2. "Neural Network Decision Modeling Tool",
With Peitsang Wu through NC State University, July, 1996.
3. "Multicustomer Due-Date Bargainer",
With H.L.W. Nuttle, D.-M. Wang, and M. Donovan through NC State University,
October, 1998.
Industrial Technical Reports:
1. "A Bayesian Interpretation of the Linearly Constrained Cross-Entropy
Minimization Problem ",
with H.S. Tsao and D.N. Lee, AT&T Bell Laboratories Technical Memorandum,
51173-901204-01TM, December 1990.
2. "Solving Stochastic Programming Problems via Kalman filter and Affine
Scaling ",
with S. Puthenpura, R. Saigal, and L. Sinha, AT&T Bell Laboratories Technical
Memorandum, 51173-900808-01TM, October 1989 (Draft), August 1990 (Final).
3. "Jensen's Inequality for Optimal Entropy Analysis ",
with H.S. Tsao and D.N. Lee, AT&T Bell Laboratories Technical Memorandum 51173-900820-01TM,
August 1990.
4. "AT&T Factory Data Network Planning Book ",
AT&T Corporate Headquarters, Technical Memorandum, October 29, 1987.
5. "AT&T Factory Data Networking Planning Baseline Architecture Document
",
AT&T Corporate Headquarters, Technical Memorandum, August 15, 1987.
6. "Intrafactory Data Network Planning - Part V: Transition Plan ",
AT&T Corporate Headquarters, Technical Memorandum, August 10, 1987.
7. "Intrafactory Data Network Planning - Part IV: Fiber Distribution Plan
",
AT&T Corporate Headquarters, Technical Memorandum, July 18, 1987.
8. "Intrafactory Data Network Planning - Part III: Target Implementation
",
AT&T Corporate Headquarters, Technical Memorandum, April 10, 1987.
9. "Intrafactory Data Network Planning - Part II: Target Architecture
",
AT&T Corporate Headquarters, Technical Memorandum, March 5, 1987.
10. "Intrafactory Data Network Planning - Part I: MAP Economics ",
AT&T Corporate Headquarters, Technical Memorandum, January 15, 1987.
11. "On the Quadratically Constrained Information Theoretic Analysis ",
with J.R. Rajasekera, AT&T Engineering Research Center, Tech Report CC8743,
September 17, 1987.
12. "Quadratic Programming with a Single Quadratic Constraint ", with
J.R. Rajasekera,
AT&T Engineering Research Center, Tech Report CC8682, June 10, 1987.
13. "A Perturbation Approach to the Main Duality Theorem of Quadratic
Geometric Programs ",
with J.R. Rajasekera, AT&T Bell Laboratories, Technical Memorandum 54142-860718-01,
July 1986.
14. "Dynamic Facility Network Planning - A Linear Programming Loader with
Arbitrary Incremental Demands and Rearrangement Capabilities ",
AT&T Bell Laboratories, Technical Memorandum 54112-860610-01, June 1986.
15. "Dynamic Facility Network Planning - A Solution Architecture with
Block Cholesky Factorization ",
AT&T Bell Laboratories, Technical Memorandum 54112-860305-01, March 1986.